Cargando…
Run 104: Beam width measurements on the circulating beam in Ring 2
Autor principal: | Brummer, P |
---|---|
Lenguaje: | eng |
Publicado: |
1971
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130345 |
Ejemplares similares
-
Rectification, ISR Running-In, Run 104 Beam width measurements on the circulating beam in ring 2
por: Brummer, P
Publicado: (1971) -
Study of horizontal beam width in Ring 2 at 11.5 GeV/c, Run 161, 24th April. 3 hours, 4 bunches
por: Brummer, P
Publicado: (1972) -
Runs no. 131 and 134, 13 and 20 December, 1971: Beam positioning and alignment of quadrupoles in the beam transport system
por: Brummer, P
Publicado: (1971) -
Run 103: Beam Transfer and Injection at 10.5 GeV/c
por: Brummer, P
Publicado: (1971) -
The measuring machine for the serial measurements on the beam transfer quadrupoles
por: Brummer, P J
Publicado: (1971)