Cargando…
Runs 317 and 320 - 22 and 25 June 1973, Ring 1 - 15 and 26 GeV/c: Preliminary tests of the magnetic beam detector installed in the SFM
Autores principales: | Gourber, J P, Wyss, C |
---|---|
Lenguaje: | eng |
Publicado: |
1973
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130364 |
Ejemplares similares
-
Run 344 - 9 August 1973, Rings 1 and 2 - 26 GeV/c - 20 bunches, SFM Running-In (No. 3 - 26FP with SFM at 1.0 T)
por: Billan, J, et al.
Publicado: (1973) -
Run 612 - 30 June 1975, Ring 1 - 26 GeV/c - Low-B- SFM, Orbit Measurements
por: Brand, K, et al.
Publicado: (1975) -
Run 436 - 30 March 1973, Ring 1 - 22.505 GeV/c, Checking of 22FP working line with the SFM
por: Wyss, C
Publicado: (1974) -
Run 342 - 7 August 1973, Rings 1 and 2 - 26 GeV/c - 20 bunches, SFM Running-In (No. 2 - 5C26 with SFM at 1.0T)
por: Perin, R, et al.
Publicado: (1973) -
Runs 320M & 326M - 25 June & 6 July 1973, Rings 1 and 2 - 26 GeV/c: Working lines 5C and FP - Closed orbits
por: Autin, B, et al.
Publicado: (1973)