Cargando…
run 334 MD - July 30-31 1973, Ring 1 and 2 - 22 GeV/c - 5C Working Lines, Test of R603 analyzing magnet without shims
Autor principal: | Taylor, T M |
---|---|
Lenguaje: | eng |
Publicado: |
1973
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130399 |
Ejemplares similares
-
Run 334 - 30th July 1973, Rings 1 and 2 - 22 Gev/c - 20 bunches: Working lines 3C22
por: Laeger, H
Publicado: (1973) -
Run 334 - 30th July 1973, Rings 1 and 2 - 22 GeV/c - 20 bunches: Check of Terwilliger Working Lines
por: Bryant, P J
Publicado: (1973) -
Run 334 - 30th July 1973, Rings 1 and 2 - 22 GeV/c - 20 bunches (1 in 3), SFM Running-In (No. 1 - 22 GeV/c at 1.0T)
por: Perin, R, et al.
Publicado: (1973) -
Run 317P - 7 July 1973, Rings 1 and 2 - 31 GeV/c: Physics Beams, Terwilliger Scheme at 31 GeV/c
por: Bryant, P J
Publicado: (1973) -
Run 614 MD - July 1975, Ring 2 - 26/31 GeV/c, Acceleration of 17.2 A to 31 GeV/c
por: Myers, S, et al.
Publicado: (1975)