Cargando…
Run 342, 26 GeV/c, 7.8.73: Trials with an automatic gain control system in the Q measuring equipment
Autores principales: | Thorndahl, L, Vaughan, A |
---|---|
Lenguaje: | eng |
Publicado: |
1973
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130407 |
Ejemplares similares
-
Run 342, 26 GeV, 7.8.73: Trials with an automatic gain control system in the Q-measuring equipment
por: Thorndahl, L, et al.
Publicado: (1973) -
Run 342, 7.8.73, 26 GeV, R1: Longitudinal density during acceleration
por: Hansen, S
Publicado: (1973) -
Run 342, 7.8.73, 26 GeV, R1: Longitudinal density during acceleration
por: Hansen, S
Publicado: (1973) -
Run 334, Ring 1, 5C 22, 20.7.73, Run 342, Ring 2, 5C 26, 7.8.73: Vacuum limit in Ring 1 and in Ring 2
por: Gröbner, Oswald
Publicado: (1973) -
Transverse feedback in R1 on 3c26 working line - 5.5 hours, Run No. 303, 26 GeV, 20 b, 1.5.73
por: Autin, B, et al.
Publicado: (1973)