Cargando…
Run 345 - 23rd August 1973, Ring 1 - 15 GeV/c - 4 bunches: Calibration by the Beam Probes of the 4-Magnet Vertical Closed Orbit Bumps in I5 on the Working Line 5C15
Autor principal: | Bryant, P J |
---|---|
Lenguaje: | eng |
Publicado: |
1973
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130423 |
Ejemplares similares
-
Run 345 - 23rd August 1973, Rings 1 and 2 - 15 GeV/c - 20 bunches (1 in 3), SFM Running-In (No. 4 - SFM at 0.65T)
por: Bryant, P J
Publicado: (1973) -
run 286 - 19 March 1973, Ring 1 - 26 GeV/c - 4 bunches: Calibration of vertical closed orbit bumps by beam probes
por: Bryant, P J, et al.
Publicado: (1973) -
Run 373 - 26 October 1973, Ring 1 - 11 GeV/c - 20 bunches: Calibration of the 4-magnet vertical bumps in I5, on the working line 5C11
por: Wyss, C
Publicado: (1974) -
Run 273 - 26/27 February 1973, Rings 1 and 2 - 15 GeV/c - 4 bunches: Working lines 15FP and 5C15
por: Bryant, P J, et al.
Publicado: (1973) -
Runs 342, 344,345 (Ring1) and 357 (both rings), 7th August - 10th September 1973: Calibration of vertical bumps with magnetic beam position detectors
por: Gourber, J P, et al.
Publicado: (1973)