Cargando…
Run 354 (26 GeV): Tests on noise signals injected into reference sources of main ring supplies
Autores principales: | Pett, J, Proudlock, P |
---|---|
Lenguaje: | eng |
Publicado: |
1973
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130439 |
Ejemplares similares
-
run 354 - 4 bunches - 26 GeV/c - R1
por: Vos, L
Publicado: (1973) -
Runs 345 and 354, 15 geV and 26 GeV, Ring 2, 4 bunches: Attemps to measure the space charge effect for bunched beams
por: Hofmann, A
Publicado: (1973) -
Full load heat run on the transformers of the main ring power supplies
por: Proudlock, P
Publicado: (1973) -
Run 398, 4.12.1973, Ring 1, 26 GeV/c, 20 bunches, 5C 26, 4 hours: Effect of main magnet ripple
por: Gourber, J P, et al.
Publicado: (1973) -
Run 354, 26.6 GeV/c, 6th September 1973: Horizontal and vertical aperture
por: Lemeilleur, F
Publicado: (1973)