Cargando…
Run 273 - 26 February 1973, Rings 1 and 2 - 15 GeV/c - 4 bunches, Run 276 - 1 March 1973, Rings 1 and 2 - 26 GeV/c - 20 bunches: Closed Orbits and Working Line 5C 26
Autor principal: | Autin, B |
---|---|
Lenguaje: | eng |
Publicado: |
1973
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130455 |
Ejemplares similares
-
Run 309 - 7 May 1973, Ring 1 - 26 GeV/c, 4 bunches, Working line 3F26
por: Autin, B
Publicado: (1973) -
Run 329 - 10 July 1973, Ring 1 - 26 GeV/c - 20 bunches: Changes of 5C26 with space charge
por: Autin, B, et al.
Publicado: (1973) -
Run 382 - 8 November 1973, Ring 1 - 26 to 31 GeV/c - 20 bunches
por: Potter, K M
Publicado: (1973) -
Run 303, 1973-4-30, Vacuum Limit in Ring 1, 26 GeV/c, 20 bunches, 1/1, 5C26
por: Fischer, E
Publicado: (1973) -
Run 361, 14.9.1973, Ring 1 (2 GeV/c) and Ring 2 (26 GeV/c), 20 bunches, 2 GeV - 26 GeV beam experiment. Lifetime of a 2 GeV beam
por: Hübner, K
Publicado: (1973)