Cargando…
Run 286 - 19 March 1973, Rings 1 and 2 - 26 GeV/c - 4 bunches, re-establlishment of 'FP' and Terwilliger lines
Autor principal: | Bryant, P J |
---|---|
Lenguaje: | eng |
Publicado: |
1973
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130464 |
Ejemplares similares
-
Run 291 - 6 April 1973, Rings 1 and 2 - 22 GeV/c - 20 bunches: FP and Terwilliger working lines
por: Bryant, P J
Publicado: (1973) -
Run 329 - 10 July 1973, Ring 2 - 26 GeV/c - 20 bunches: Maximum Terwilliger Stacks
por: Bryant, P J
Publicado: (1973) -
run 286 - 19 March 1973, Ring 1 - 26 GeV/c - 4 bunches: Calibration of vertical closed orbit bumps by beam probes
por: Bryant, P J, et al.
Publicado: (1973) -
Run 286M - 20 March 1973, Ring 2 - 4 bunches - 26 GeV/c: Orbit Distortion due to sextupoles
por: Autin, B
Publicado: (1973) -
Run 312 - 14 May 1973, Rings 1 and 2 - 26 GeV/c - 20 bunches: 10 A with the Terwilliger scheme using feedback stabilization
por: Bryant, P J
Publicado: (1973)