Cargando…
run 286 - 19 March 1973, Ring 1 - 26 GeV/c - 4 bunches: Calibration of vertical closed orbit bumps by beam probes
Autores principales: | Bryant, P J, Schneider, F |
---|---|
Lenguaje: | eng |
Publicado: |
1973
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130467 |
Ejemplares similares
-
Run 286 - 20 March 1973, 26 GeV/c 20 bunches 1 in 3: Distortion of vertical closed orbit bumps by space charge effects
por: Potter, K M
Publicado: (1973) -
Run 276 - 1st March 1973, Ring 1 - 26 GeV/c - 20 bunches, The Correction of Vertical Closed Orbit Bumps for Shifts in $Q_{V}$
por: Bryant, P J
Publicado: (1973) -
Run 286M - 20 March 1973, Ring 2 - 4 bunches - 26 GeV/c: Orbit Distortion due to sextupoles
por: Autin, B
Publicado: (1973) -
Run 286 - 19 March 1973, Rings 1 and 2 - 26 GeV/c - 4 bunches, re-establlishment of 'FP' and Terwilliger lines
por: Bryant, P J
Publicado: (1973) -
Run 260 - 27 November 1972, Ring 1 - 26 GeV/c - 4 bunches, Heights of vertical closed orbit bumps across the aperture
por: Bryant, P J
Publicado: (1972)