Cargando…
Run 290, 26 GeV/c, R1, 20 bunches, 5 hours, FP 26 working line and transverse feedback against the 9th, 10th, 8th and 11th modes
Autores principales: | Carron, G, Thorndahl, L, Vaughan, A |
---|---|
Lenguaje: | eng |
Publicado: |
1973
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130471 |
Ejemplares similares
-
Run 299 - 26 GeV/c - 20 bunches - R1, Transverse feedback on 26 FP
por: Autin, B, et al.
Publicado: (1973) -
Run 290, 23rd-24th March 1973, 26 GeV/c, 20 bunches: Phase displacement acceleration
por: De Jonge, M J, et al.
Publicado: (1973) -
Transverse modes with FP, Run 612, R1, 26 GeV/c, 4 hours (2 of the 4 hours were lost)
por: Myers, S, et al.
Publicado: (1975) -
Run 152 - 27th March 1972 - Ring 2 - 26.624 GeV/c - 4 bunches, Run 168 - 5th May 1972 - Ring 1 - 26.594 GeV/c - 20 bunches: Working line for physics 26 FP (FATA Physics)
por: Gourber, J P, et al.
Publicado: (1972) -
Run 231, 20th September 1972, 26 GeV, Ring 1, 2 FP, Run 232, 25th September 1972, 26 GeV, Ring 1, 26 FP: Increased pumping speed and studies of surface conditions in section 333
por: Calder, R, et al.
Publicado: (1972)