Cargando…
Run no. 300, 12.4.73, 22 GeV, 20 b R1: Equipment test, bunch to bunch feedback
Autores principales: | Hansen, S, Peschardt, E |
---|---|
Lenguaje: | eng |
Publicado: |
1973
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130492 |
Ejemplares similares
-
Run no. 309, 7.5.73, 26 GeV, 4b, R2: Equipment test, bunch to bunch feedback
por: Hansen, S, et al.
Publicado: (1973) -
Run no. 309, 7.5.73, 26 GeV, 4b, R2: Equipment test, bunch to bunch feedback
por: Hansen, S, et al.
Publicado: (1973) -
Run 365, 4.10.73, 22 GeV, 2 h, R2, Run 372, 11.10.73, 26 GeV, 2 h, R2: Test of equipment for the bunch-to-bunch feedback system with the experimental cavity on
por: Hansen, S, et al.
Publicado: (1973) -
Run 300, 12.4.73, Ring 2, 22 GeV/c: Search for resonance frequency of coupling impedance causing longitudinal instability of the bunched beam
por: Schnell, Wolfgang
Publicado: (1973) -
Run 344, 9.8.73, R2, 20 b, 2 h: Further tests of equipment for bunch to bunch feedback system
por: Hansen, S, et al.
Publicado: (1973)