Cargando…
Run 303 (30-4-73) - Run 309 (7.5.73), Ring 1, 20 bunches + 4 bunches, Ring 2, 20 bunches: Veritcal beam blow-up after acceleration along 5C26
Autor principal: | Hübner, K |
---|---|
Lenguaje: | eng |
Publicado: |
1973
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130511 |
Ejemplares similares
-
Run no. 309, 7.5.73, 26 GeV, 4b, R2: Equipment test, bunch to bunch feedback
por: Hansen, S, et al.
Publicado: (1973) -
Run no. 309, 7.5.73, 26 GeV, 4b, R2: Equipment test, bunch to bunch feedback
por: Hansen, S, et al.
Publicado: (1973) -
Run no. 309, 7.5.73, 26 GeV, 4 bunches, R2: Closed loop matching
por: Hansen, S
Publicado: (1973) -
Run no. 309, 7.5.73, 26 GeV, 4 bunches, R2: Closed loop matching
por: Hansen, S
Publicado: (1973) -
Run 290, 26 GeV/c, 20 bunches, 23.3.73, Ring 2: Damping of Long Bunch Oscillations
por: Hofmann, A, et al.
Publicado: (1973)