Cargando…
Run 309 - 8 May 1973, 26 GeV/c Ring 1 20b 1 in 3: Beam height and vertical halo measurements
Autor principal: | Potter, K M |
---|---|
Lenguaje: | eng |
Publicado: |
1973
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130524 |
Ejemplares similares
-
Run 320 - 25 May 1973, 26 GeV/c Ring 2 20b: Vertical halo measurements on scraped beams
por: Potter, K M
Publicado: (1973) -
Run 309, 7th May 1973, Ring 2, 26 GeV: Phase oscillations with 4 and with 20 bunches
por: Hofmann, A, et al.
Publicado: (1973) -
Run 309 - 7 May 1973, Ring 1 - 26 GeV/c, 4 bunches, Working line 3F26
por: Autin, B
Publicado: (1973) -
Run 382 - 8 November 1973, Ring 1 - 26 to 31 GeV/c - 20 bunches
por: Potter, K M
Publicado: (1973) -
Run 309M - 8 May 1973, Rings 1 and 2 - 26 GeV/c - 20 bunches: Influence of a high intensity stack on the vertical size of a single pulse
por: Laeger, H
Publicado: (1973)