Cargando…
Run 312 - 14 May 1973, Rings 1 and 2 - 26 GeV/c - 20 bunches: 10 A with the Terwilliger scheme using feedback stabilization
Autor principal: | Bryant, P J |
---|---|
Lenguaje: | eng |
Publicado: |
1973
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130526 |
Ejemplares similares
-
Run 329 - 10 July 1973, Ring 2 - 26 GeV/c - 20 bunches: Maximum Terwilliger Stacks
por: Bryant, P J
Publicado: (1973) -
Run 376 - 29 October 1973, Rings 1 and 2 - 26 to 31 GeV/c - 20 bunches: 31 GeV/c operation with the SFM and the Terwilliger scheme
por: Bryant, P J
Publicado: (1973) -
Run 286 - 19 March 1973, Rings 1 and 2 - 26 GeV/c - 4 bunches, re-establlishment of 'FP' and Terwilliger lines
por: Bryant, P J
Publicado: (1973) -
Run 250 - 1 November 1972, Rings 1 and 2 - 26 GeV/c - 20 bunches, Higher intensities with the Terwilliger scheme
por: Bryant, P J
Publicado: (1972) -
Run 177 - 29 May 1972, Rings 1 and 2 - 26.624 GeV/c - 4 bunches Working line for Terwilliger scheme
por: Bryant, P J
Publicado: (1972)