Cargando…
Run 290F - 17th May 1973, Rings 1 +2, 26.6 GeV/c 20 bunches 5C26: Observations During Set-up and Stacking in 315 F
Autores principales: | Myers, S, Vos, L |
---|---|
Lenguaje: | eng |
Publicado: |
1973
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130532 |
Ejemplares similares
-
Run 290 - 24th March 1973, Ring 2 - 26.6 GeV/c - 20 bunches 5C26: Variations of Longitudinal Density Measured by Spill-Out
por: Myers, S
Publicado: (1973) -
Run 290, 23rd-24th March 1973, 26 GeV/c, 20 bunches: Phase displacement acceleration
por: De Jonge, M J, et al.
Publicado: (1973) -
Run 312 MD - 14th May, 1973, Ring 2, 26.6 GeV/c, 20 b, 5C26: Equipment Test
por: Myers, S, et al.
Publicado: (1973) -
Run 309 - 7 May 1973, Ring 1 - 26 GeV/c, 4 bunches, Working line 3F26
por: Autin, B
Publicado: (1973) -
Run 354, 26.6 GeV/c, 6th September 1973: Horizontal and vertical aperture
por: Lemeilleur, F
Publicado: (1973)