Cargando…
4.10.73, Run 365, 20b - 1.8$^{.}10^{12}$p/pulse, 22 GeV, 9.10.73, Run 370, 20b - 1.8$^{.}10^{12}$p/pulse, 26 GeV: Test of BPMO in the transfer line
Autores principales: | Oels, M, Risselada, Thys |
---|---|
Lenguaje: | eng |
Publicado: |
1973
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130566 |
Ejemplares similares
-
Run 370, 26 geV/c, 20 bunches, 9.10.73: Phase displacement acceleration
por: Henrichsen, K N, et al.
Publicado: (1973) -
Run 370, 26 GeV/c, 20 bunches, 9.10.73: Phase displacement acceleration
por: Henrichsen, K N, et al.
Publicado: (1973) -
Beam Transfer Pick-Ups: Run 376, 29.10.73, 26 GeV, 20 bunches, R1, Run 382, 09.11.73, 26 GeV, 20 bunches, R2
por: Borer, J, et al.
Publicado: (1973) -
Run 365, 4.10.73, 22 GeV, 2 h, R2, Run 372, 11.10.73, 26 GeV, 2 h, R2: Test of equipment for the bunch-to-bunch feedback system with the experimental cavity on
por: Hansen, S, et al.
Publicado: (1973) -
Run 376, 29.10.73, 26 GeV, 20 bunches: Running-in of the BPMS in the single turn mode (first turn)
por: Borer, J, et al.
Publicado: (1973)