Cargando…
Run 370 - 9 October 1973, Rings 1 and 2 - 26 GeV/c, Slope Bumps
Autor principal: | Bryant, P J |
---|---|
Lenguaje: | eng |
Publicado: |
1974
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130603 |
Ejemplares similares
-
Run 370, 9.10.1973, Ring 2, 26 GeV: Attempt to increase the Landau damping for longitudinal bunch oscillations
por: Hofmann, A
Publicado: (1973) -
Run 370, 10.10.1973 - Ring 1, 26.589 GeV/c, Run 390, 26.11.1973 - Ring 1, 22.505 GeV/c: Scattering of protons by phase displacement acceleration
por: Messerschmid, E, et al.
Publicado: (1973) -
run 286 - 19 March 1973, Ring 1 - 26 GeV/c - 4 bunches: Calibration of vertical closed orbit bumps by beam probes
por: Bryant, P J, et al.
Publicado: (1973) -
Run 276 - 1st March 1973, Ring 1 - 26 GeV/c - 20 bunches, The Correction of Vertical Closed Orbit Bumps for Shifts in $Q_{V}$
por: Bryant, P J
Publicado: (1973) -
Run 390 - 26 November 1973 - Ring 2 - 22 GeV/c, Run 400 - 6 December 1973 - Ring 2 - 26 GeV/c, Run 403 - 11 December 1973 - Ring 2 - 22 GeV/c: Preliminary investigations of the perturbations caused by a solenoid inclined to the beam axis
por: Bryant, P J, et al.
Publicado: (1974)