Cargando…
Run 373 - 26 October 1973, Ring 1 - 11 GeV/c - 20 bunches: Calibration of the 4-magnet vertical bumps in I5, on the working line 5C11
Autor principal: | Wyss, C |
---|---|
Lenguaje: | eng |
Publicado: |
1974
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130620 |
Ejemplares similares
-
run 286 - 19 March 1973, Ring 1 - 26 GeV/c - 4 bunches: Calibration of vertical closed orbit bumps by beam probes
por: Bryant, P J, et al.
Publicado: (1973) -
Run 370 - 9 October 1973, Rings 1 and 2 - 26 GeV/c, Slope Bumps
por: Bryant, P J
Publicado: (1974) -
Run 382, 8.11.1973, Ring 1 and 2, 26 GeV/c: Behaviour of small stacks on WL 5C
por: Wyss, C
Publicado: (1973) -
Run 309 - 5 May 1973, Ring 2 - 26 GeV/c, 20 bunches, Do the localized sextupoles cause $h_{eff}$ to increase when vertical bumps are applied?
por: Bryant, P J
Publicado: (1973) -
Run 286 - 20 March 1973, 26 GeV/c 20 bunches 1 in 3: Distortion of vertical closed orbit bumps by space charge effects
por: Potter, K M
Publicado: (1973)