Cargando…
Run 382 - 8 November 1973, Ring 1 - 26 to 31 GeV/c - 20 bunches
Autor principal: | Potter, K M |
---|---|
Lenguaje: | eng |
Publicado: |
1973
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130639 |
Ejemplares similares
-
Run 382 - 9 November 1973, Ring 1 - 26 GeV/c: Optimization of Terwilliger Diamond
por: Wyss, C
Publicado: (1974) -
Run 376 - 29 October 1973, Rings 1 and 2 - 26 to 31 GeV/c - 20 bunches: 31 GeV/c operation with the SFM and the Terwilliger scheme
por: Bryant, P J
Publicado: (1973) -
Run 344 - 9 August 1973, Rings 1 and 2 - 26 GeV/c - 20 bunches, SFM Running-In (No. 3 - 26FP with SFM at 1.0 T)
por: Billan, J, et al.
Publicado: (1973) -
Run 273 - 26 February 1973, Rings 1 and 2 - 15 GeV/c - 4 bunches, Run 276 - 1 March 1973, Rings 1 and 2 - 26 GeV/c - 20 bunches: Closed Orbits and Working Line 5C 26
por: Autin, B
Publicado: (1973) -
Run 329 - 10 July 1973, Ring 2 - 26 GeV/c - 20 bunches: Maximum Terwilliger Stacks
por: Bryant, P J
Publicado: (1973)