Cargando…
Run 382 - 9 November 1973, Ring 1 - 26 GeV/c: Optimization of Terwilliger Diamond
Autor principal: | Wyss, C |
---|---|
Lenguaje: | eng |
Publicado: |
1974
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130642 |
Ejemplares similares
-
Run 382 - 8 November 1973, Ring 1 - 26 to 31 GeV/c - 20 bunches
por: Potter, K M
Publicado: (1973) -
Run 382, 8.11.1973, Ring 1 and 2, 26 GeV/c: Behaviour of small stacks on WL 5C
por: Wyss, C
Publicado: (1973) -
Run 329 - 10 July 1973, Ring 2 - 26 GeV/c - 20 bunches: Maximum Terwilliger Stacks
por: Bryant, P J
Publicado: (1973) -
Run 651 - 3 November 1975, Ring 1 - 26 GeV/c, Check of QCOM with Terwilliger scheme
por: Guignard, G
Publicado: (1975) -
Run 286 - 19 March 1973, Rings 1 and 2 - 26 GeV/c - 4 bunches, re-establlishment of 'FP' and Terwilliger lines
por: Bryant, P J
Publicado: (1973)