Cargando…
Run 390, 22 geV/c, 26.11.73: Pressure Situation after Nov. Shutdown, Parasitic observations during testing of 8C lines
Autor principal: | Jones, E |
---|---|
Lenguaje: | eng |
Publicado: |
1973
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130656 |
Ejemplares similares
-
Determination of the nuclear scattering pressure from the measurement of the clearing current, parasitic observations in run 390, 22 GeV/c, 26.11.73
por: Gröbner, Oswald
Publicado: (1973) -
B.T. Pick-Up Position and Injected Pulse Rate: Run 390, 26.11.73, 22 GeV
por: Risselada, Thys
Publicado: (1973) -
Run 390M on 26.11.73: Tests of software for the computerized RF using program controlled beam injection
por: Tausch, L, et al.
Publicado: (1973) -
Run 365, Ring 1, 22 GeV/c, Run 382, Ring 2, 26 GeV/c, Run 390, Ring 1, 22 GeV/c: Tests on the Improved Beam Dump Monitors
por: Barlow, A K, et al.
Publicado: (1973) -
Run 407 - 26 GeV/c - 8C26 - Both Rings, 17/12/73
por: Vos, L
Publicado: (1974)