"ISR Performance Report, Run 390 - 26 November 1973, Rings 1 and 2 - 22 GeV/c - 20 bunches, ""8C"" a dynamically compensated working line"
Autores principales: | Bryant, P J, Gourber, J P |
---|---|
Lenguaje: | eng |
Publicado: |
1973
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130660 |
Ejemplares similares
-
Run 390 - 26 November 1973 - Ring 2 - 22 GeV/c, Run 400 - 6 December 1973 - Ring 2 - 26 GeV/c, Run 403 - 11 December 1973 - Ring 2 - 22 GeV/c: Preliminary investigations of the perturbations caused by a solenoid inclined to the beam axis
por: Bryant, P J, et al.
Publicado: (1974) -
Run 344 - 9 August 1973, Rings 1 and 2 - 26 GeV/c - 20 bunches, SFM Running-In (No. 3 - 26FP with SFM at 1.0 T)
por: Billan, J, et al.
Publicado: (1973) -
Run 382 - 8 November 1973, Ring 1 - 26 to 31 GeV/c - 20 bunches
por: Potter, K M
Publicado: (1973) -
Run 303M - 30 April 1973, Rings 1 and 2 - 26 GeV/c - 20 bunches, Working line 5C26
por: Gourber, J P, et al.
Publicado: (1973) -
Run 357 - 10 September 1973, Rings 1 and 2 - 26 GeV/c - 20 bunches: Dipolar beam-beam effect
por: Gourber, J P
Publicado: (1973)