Cargando…
Run 398 - 4 December 1974, Rings 1 and 2 - 26 GeV/c: The '8C' working line for 17.6 A at 26 GeV/c
Autores principales: | Bryant, P J, Gourber, J P |
---|---|
Lenguaje: | eng |
Publicado: |
1974
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130667 |
Ejemplares similares
-
Run 580 -26 GeV/c - 18.3.1975, Run 586 - 26 GeV/c - 26.3.1975, Run 590 - 26 GeV/c - 8.4.1975: Tests with the low-B insertion in 17
por: Autin, B, et al.
Publicado: (1975) -
Run 600 - 19 May 1975 - 26 GeV/c, Run 603P - 24 May 1975 - 26 GeV/c
por: Brand, K, et al.
Publicado: (1975) -
Run 546 - 13 November 1974, Ring 1 - 26 GeV/c: Stacking on ELSA
por: Bryant, P J
Publicado: (1974) -
Run 564 - 9 December 1974, Rings 1 and 2 - 26 GeV/c - SFM 1.0T: Fifth test of steel low-B insertion
por: Brand, K, et al.
Publicado: (1974) -
Run 776 - 18 November - 26 GeV/c - Rings 1 and 2, Run 791 - 13 December 1976 - 26 GeV/c - Physics set-up and run, Run 764 - 20 December 1976 - 26 GeV/c - Physics run and luminosity, First running-in tests of I1 superconducting solenoid
por: Bryant, P J, et al.
Publicado: (1977)