Cargando…
Full load heat run on the transformers of the main ring power supplies
Autor principal: | Proudlock, P |
---|---|
Lenguaje: | eng |
Publicado: |
1973
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130699 |
Ejemplares similares
-
: Tests on active filter of ISR Main Power Supply, Ring 1
por: Beuret, A, et al.
Publicado: (1973) -
Run 354 (26 GeV): Tests on noise signals injected into reference sources of main ring supplies
por: Pett, J, et al.
Publicado: (1973) -
Measurement of Magnet Load for ISR Main Ring Power Supplies
por: Beuret, A, et al.
Publicado: (1973) -
The use of switch-mode power converters for the LEP main ring power converter system
por: Proudlock, Paul, et al.
Publicado: (1987) -
The Ags Booster Main Ring Power Supply System
por: Soukas, A, et al.
Publicado: (1990)