Cargando…
Run 413 - 20 February 1974, Rings 1 and 2 - 26 GeV/c: Checking of 8C26 working line with the SFM
Autor principal: | Wyss, C |
---|---|
Lenguaje: | eng |
Publicado: |
1974
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130706 |
Ejemplares similares
-
Run 415 - 21 February 1974, Rings 1 and 2 - 26 to 31 GeV/c with SFM: Acceleration to 31.44 GeV/c with separated beams
por: Henrichsen, K N, et al.
Publicado: (1974) -
Run 468 - 23 May 1974, Rings 1 and 2 - 26.57 to 31.4 GeV/c with SFM: Acceleration to 31.4 GeV/c
por: De Jonge, M J, et al.
Publicado: (1974) -
Run 342 - 7 August 1973, Rings 1 and 2 - 26 GeV/c - 20 bunches, SFM Running-In (No. 2 - 5C26 with SFM at 1.0T)
por: Perin, R, et al.
Publicado: (1973) -
Run 344 - 9 August 1973, Rings 1 and 2 - 26 GeV/c - 20 bunches, SFM Running-In (No. 3 - 26FP with SFM at 1.0 T)
por: Billan, J, et al.
Publicado: (1973) -
Run 416 - 22 February 1974, Ring 2 - 26.588 GeV7c (with SFM): Preliminary tests of the octupoles for the compensation of 4th order resonances
por: Gourber, J P
Publicado: (1974)