Cargando…
Run 447, 11 GeV, 1.5.74, $3 x 10^{11}$P/p, 4 bunches, B.T. Pick-up Test
Autores principales: | Borer, J, Oels, M |
---|---|
Lenguaje: | eng |
Publicado: |
1974
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130752 |
Ejemplares similares
-
Run 447, 1.5.74, 11 GeV/c, 20 bunches, line 11 SM: Calibration of the scaling factor of the vertical P.U. readings with the I5 scaper
por: Borer, J
Publicado: (1974) -
Beam Transfer Pick-Ups: Run 376, 29.10.73, 26 GeV, 20 bunches, R1, Run 382, 09.11.73, 26 GeV, 20 bunches, R2
por: Borer, J, et al.
Publicado: (1973) -
Run 544, 11.11.1974, 22 GeV, 20 bunches: Transfer Beam Position Monitoring System Test
por: Borer, J, et al.
Publicado: (1974) -
Run 434, 28.3.74: Parasitic use of BT PU's during the IOPT test
por: Borer, J, et al.
Publicado: (1974) -
Run 544, 11.11.74, 22 GeV, R2, 0.5 rate: The bunch by bunch feedback system during acceleration
por: Hansen, S, et al.
Publicado: (1974)