Cargando…
Run 454 M, 26FP, Ring 1, 20 b, 1/1, 6.5.74: Test on Transverse Feedback Systems
Autores principales: | Myers, S, Thorndahl, L, Vaughan, A |
---|---|
Lenguaje: | eng |
Publicado: |
1974
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130758 |
Ejemplares similares
-
Run 299 - 26 GeV/c - 20 bunches - R1, Transverse feedback on 26 FP
por: Autin, B, et al.
Publicado: (1973) -
Run 463, R1, 26 GeV/c, 4h, 20.5.74: Brick wall with transverse feedback and extended frequency range
por: Carron, G, et al.
Publicado: (1974) -
Run 290, 26 GeV/c, R1, 20 bunches, 5 hours, FP 26 working line and transverse feedback against the 9th, 10th, 8th and 11th modes
por: Carron, G, et al.
Publicado: (1973) -
Transverse modes with FP, Run 612, R1, 26 GeV/c, 4 hours (2 of the 4 hours were lost)
por: Myers, S, et al.
Publicado: (1975) -
Transverse feedback in R1 on 3c26 working line - 5.5 hours, Run No. 303, 26 GeV, 20 b, 1.5.73
por: Autin, B, et al.
Publicado: (1973)