Cargando…
Run 451, 7.5.1974, Ring 1, 26 GeV: Influence of vertical scraping on the bunch length
Autor principal: | Hofmann, A |
---|---|
Lenguaje: | eng |
Publicado: |
1974
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130760 |
Ejemplares similares
-
Run 451, 7.5.1974, Ring 1 and 2, 26 GeV: Further studies of electron-proton instabilities
por: Gröbner, Oswald, et al.
Publicado: (1974) -
Run 463, 20.5.1974, Ring 1, 26 geV: Influence of vertical scraping on the bunch length, the debunching time and the spill-out
por: Hansen, S, et al.
Publicado: (1974) -
Run 451, 6.5.1974, ring 2, 26 GeV: Landau damping microwaves
por: Hofmann, A, et al.
Publicado: (1974) -
Run 511, 26.8.1974, Ring 1, 26 GeV: Monitors of transverse oscillations of bunched beams
por: Hofmann, A
Publicado: (1974) -
Run 561, 4.12.1974, Ring 1, 26 GeV, Run 564, 9.12.1974, Ring 2, 26 GeV: Intensity dependence of bunch length, debunching time, bunch area and bucket size and observation of high frequency structure during debunching
por: Hansen, S, et al.
Publicado: (1975)