Cargando…
Run 463, 20.5.1974, Ring 1, 26 geV: Influence of vertical scraping on the bunch length, the debunching time and the spill-out
Autores principales: | Hansen, S, Hofmann, A |
---|---|
Lenguaje: | eng |
Publicado: |
1974
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130770 |
Ejemplares similares
-
Run 451, 7.5.1974, Ring 1, 26 GeV: Influence of vertical scraping on the bunch length
por: Hofmann, A
Publicado: (1974) -
Run 561, 4.12.1974, Ring 1, 26 GeV, Run 564, 9.12.1974, Ring 2, 26 GeV: Intensity dependence of bunch length, debunching time, bunch area and bucket size and observation of high frequency structure during debunching
por: Hansen, S, et al.
Publicado: (1975) -
Run 511, 26.8.1974, Ring 1, 26 GeV: Monitors of transverse oscillations of bunched beams
por: Hofmann, A
Publicado: (1974) -
Run 577, 13.3.1975, Ring 1 and 2, 26 GeV, Run 580, 17.3.1975, Ring 1, 26 GeV: High frequency structure during debunching and blow-up of the bunch area
por: Hofmann, A, et al.
Publicado: (1975) -
Run 427, 6.3.1974, Run 430, 9.3.1974, Ring 1, 11.8 and 26 GeV: Space charge effect for bunched beams
por: Hofmann, A, et al.
Publicado: (1974)