Cargando…
Run 470 - 30 MAy 1974, Ring 2 - 22 GeV: Improved Vertical Closed Orbit Correction for Test Solenoid
Autores principales: | Bryant, P J, Kantardjian, G |
---|---|
Lenguaje: | eng |
Publicado: |
1974
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130781 |
Ejemplares similares
-
Run 427 - 6th March 1974, Ring 2 - 11 Gev/c: Solenoid Measurements at 11 GeV/c
por: Bryant, P J, et al.
Publicado: (1974) -
Run 479 (physics) - 12 June 1974, Ring 2 - 22 GeV/c: Search for long term coupling effects excited by the model solenoid on a physics stack
por: Bryant, P J, et al.
Publicado: (1974) -
Run 489 (physics) - 4th July 1974, Ring 2 - 22 GeV/c: Search for Long Term Coupling Effects Excited by the Model Solenoid on a Physics Stack (2nd Run)
por: Kantardjian, G, et al.
Publicado: (1974) -
Run 390 - 26 November 1973 - Ring 2 - 22 GeV/c, Run 400 - 6 December 1973 - Ring 2 - 26 GeV/c, Run 403 - 11 December 1973 - Ring 2 - 22 GeV/c: Preliminary investigations of the perturbations caused by a solenoid inclined to the beam axis
por: Bryant, P J, et al.
Publicado: (1974) -
Run 470 - 30 MAy 1974, Ring 1 - 22.505 GeV/c: The effect of reducing the Superperiodicity of the ISR to Unity, First part - Set-up of working line
por: Autin, B, et al.
Publicado: (1974)