Run 475, 22 GeV, 20 b, R2, 5.6.74: Working line measurements using computer (ARGUS) control of the RF system
Autores principales: | Hansen, S, De Jonge, M J |
---|---|
Lenguaje: | eng |
Publicado: |
1974
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130784 |
Ejemplares similares
-
Run 475, 5.6.74, 22 GeV, 20 b, R1: Closed loop matching
por: Hansen, S, et al.
Publicado: (1974) -
Test of the new B amplitude processing box: Run 475, 5.6.74
por: Borer, J, et al.
Publicado: (1974) -
Run No. 204. 22 GeV/c, 20 bunches, 26.7.1972, RF Studies in R 2
por: De Jonge, M J, et al.
Publicado: (1972) -
Run 475, 22 GeV/c, 20 bunches: R2, Beam size as a function of shaving
por: Vos, L
Publicado: (1974) -
Run no. 124, 22.11.1971, 4 bunches, 22 GeV, Working line 22 FB
por: Hansen, S, et al.