Cargando…
Present status of the bunch-by-bunch feedback system (BBFS) after runs 451 and 463
Autores principales: | Hansen, S, Peschardt, E |
---|---|
Lenguaje: | eng |
Publicado: |
1974
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130811 |
Ejemplares similares
-
Run 580, 17.3.75, 26 GeV, R2: Bunch-by-bunch feedback
por: Hansen, S, et al.
Publicado: (1975) -
Run 517, 5.9.74, 11 GeV, 4b, R2: Test of the bunch by bunch feedback system with 4 bunches
por: Hansen, S, et al.
Publicado: (1974) -
Run 334, 30.7.73, R2, 2 hours: Test of equipment for the bunch-to-bunch feedback system
por: Hansen, S, et al.
Publicado: (1973) -
Run 531, 26 GeV/c, 23.9.74: Bunch by bunch feedback - adjustments - acceleration
por: Hansen, S, et al.
Publicado: (1974) -
Run 564, 9.12.64, 26 GeV, R2: The bunch-by-bunch feedback system with booster intensities
por: Hansen, S, et al.
Publicado: (1974)