Cargando…
Vacuum observations with two 24 A beams: Run 516 with booster, 3o. - 31.8.74, working line 5V26
Autores principales: | Fischer, E, Gröbner, Oswald |
---|---|
Lenguaje: | eng |
Publicado: |
1974
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130871 |
Ejemplares similares
-
Run 326, Ring 1, 26 GeV, 5C line and parasitic observations in run 329, 26 GeV: Vacuum observations in Sector 31
por: Gröbner, Oswald
Publicado: (1973) -
Run 418 P, 8C26, Ring 1 - 23.02.74; Run 419, 5C26, Ring 1 - 25.02.74; Run 430, 5C26, Ring 1 - 9.3.74: Results from 800$^{o}$C treated stainless steel surface in section 333
por: Calder, R, et al.
Publicado: (1974) -
Run 558, working line 8C22, 2.12.74: Influence of clearing on beam behaviour
por: Gröbner, Oswald, et al.
Publicado: (1975) -
"ISR Performance Report, ""Beam Clearing"" with Argon ions and hot vacuum chamber, Run 246 - 31st October 1972, Ring 1, 2C22"
por: Gröbner, Oswald
Publicado: (1972) -
R1 short term vacuum limit, Run 965, 17.8.78, 26 GeV/c, ELVA working line
por: Gröbner, Oswald
Publicado: (1978)