Cargando…
Run 517, 5.9.74, 11 GeV, 4b, R2: Test of the bunch by bunch feedback system with 4 bunches
Autores principales: | Hansen, S, Peschardt, E |
---|---|
Lenguaje: | eng |
Publicado: |
1974
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130874 |
Ejemplares similares
-
Run 531, 26 GeV/c, 23.9.74: Bunch by bunch feedback - adjustments - acceleration
por: Hansen, S, et al.
Publicado: (1974) -
Run 520, 9.9.74, 26 GeV, 20b, R2: Test of the bunch by bunch feedback system with 20 bunches
por: Peschardt, E
Publicado: (1974) -
Run 543, 25.10.74, 26 GeV, 20 b, R2: Bunch by bunch feedback
por: Hansen, S, et al.
Publicado: (1974) -
Run 544, 11.11.74, 22 GeV, R2, 0.5 rate: The bunch by bunch feedback system during acceleration
por: Hansen, S, et al.
Publicado: (1974) -
Run 516, 26 GeV, 30.8.74, 20 b, R2: Bunch to bunch feedback - open loop test
por: Hansen, S, et al.
Publicado: (1974)