Cargando…
Run 528 - 19 September 1974, Ring 1 - 26 GeV/c: Preparation of a working line for the steel low-B section
Autores principales: | Brand, K, Gourber, J P |
---|---|
Lenguaje: | eng |
Publicado: |
1974
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130886 |
Ejemplares similares
-
Run 539 - 21 October 1974, Run 543 - 25 October 1974, Rings 1 and 2 - 26 geV/c: First and second test of the steel low-B section
por: Brand, K, et al.
Publicado: (1974) -
Run 528, 19.9.1974, Ring 2, 26 GeV: Longitudinal inductive shunt impedance in Ring 2
por: Hofmann, A
Publicado: (1974) -
Run 564 - 9 December 1974, Rings 1 and 2 - 26 GeV/c - SFM 1.0T: Fifth test of steel low-B insertion
por: Brand, K, et al.
Publicado: (1974) -
Run 398 - 4 December 1974, Rings 1 and 2 - 26 GeV/c: The '8C' working line for 17.6 A at 26 GeV/c
por: Bryant, P J, et al.
Publicado: (1974) -
Run 546 - 13th November 1974, Rings 1 and 2 - 26 Gev/c: Third Test of the Steel Low-B Section
por: Brand, K, et al.
Publicado: (1974)