Cargando…
Run 558, working line 8C22, 2.12.74: Influence of clearing on beam behaviour
Autores principales: | Gröbner, Oswald, Hübner, K |
---|---|
Lenguaje: | eng |
Publicado: |
1975
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130944 |
Ejemplares similares
-
Runs 558M, 561F, 562F, 564M, 2.12.74 - 9.12.74: Effect of Inductive Wall on the Stack Density
por: Myers, S
Publicado: (1975) -
Run 558, 2.12.74, 22 GeV/c, Ring 2: Wide Band PU (Gap) used in transverse mode, head-tail effect and transverse wall impedance
por: Borer, J, et al.
Publicado: (1975) -
Clearing, Pressure Bump, Beam Behaviour, Run 590, 7.4.75, R1 + R2, 26 GeV/c
por: Gröbner, Oswald, et al.
Publicado: (1975) -
Run 171, 17.5.1972, 22 GeV/c, 20 bunches, Ring 1: Stacking With Clearing Off
por: Gröbner, Oswald, et al.
Publicado: (1972) -
Vacuum observations with two 24 A beams: Run 516 with booster, 3o. - 31.8.74, working line 5V26
por: Fischer, E, et al.
Publicado: (1974)