Cargando…
Run 577, 13.3.1975, Ring 1 and 2, 26 GeV, Run 580, 17.3.1975, Ring 1, 26 GeV: High frequency structure during debunching and blow-up of the bunch area
Autores principales: | Hofmann, A, Hansen, S, Sabersky, A |
---|---|
Lenguaje: | eng |
Publicado: |
1975
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130966 |
Ejemplares similares
-
Run 580, 17.3.1975, Ring 2, 26 GeV, Run 595, 13.5.1975, Ring 2, 26 GeV
por: Bramham, P, et al.
Publicado: (1975) -
Run 575 - 26 GeV/c - 10.3.1975, Run 580 - 26 GeV/c - 17.3.1975, Run 587 - 15 GeV/c - 3.4.1975: Various coupling measurements in the ISR
por: Bryant, P J, et al.
Publicado: (1975) -
Run 575, 577 and 580, Rings 1 and 2, 26 GeV/c
por: Barlow, A K
Publicado: (1975) -
Run 580 -26 GeV/c - 18.3.1975, Run 586 - 26 GeV/c - 26.3.1975, Run 590 - 26 GeV/c - 8.4.1975: Tests with the low-B insertion in 17
por: Autin, B, et al.
Publicado: (1975) -
Run 612, 30th June 1975, 26 GeV, Low-frequency longitudinal bunch instability during debunching
por: Sabersky, A
Publicado: (1975)