Cargando…
Run 580 -26 GeV/c - 18.3.1975, Run 586 - 26 GeV/c - 26.3.1975, Run 590 - 26 GeV/c - 8.4.1975: Tests with the low-B insertion in 17
Autores principales: | Autin, B, Brand, K, Gourber, J P |
---|---|
Lenguaje: | eng |
Publicado: |
1975
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130972 |
Ejemplares similares
-
Run 600 - 19 May 1975 - 26 GeV/c, Run 603P - 24 May 1975 - 26 GeV/c
por: Brand, K, et al.
Publicado: (1975) -
Run 575 - 26 GeV/c - 10.3.1975, Run 580 - 26 GeV/c - 17.3.1975, Run 587 - 15 GeV/c - 3.4.1975: Various coupling measurements in the ISR
por: Bryant, P J, et al.
Publicado: (1975) -
Run 580, 17.3.1975, Ring 2, 26 GeV, Run 595, 13.5.1975, Ring 2, 26 GeV
por: Bramham, P, et al.
Publicado: (1975) -
Run 600, 20.5.1975, Ring 2, 26 GeV, Run 605, 27.5.1975, Ring 2, 26 GeV, Run 610, 28.6.1975, Ring 2, 26 GeV, Making stable bunches with an active Landau cavity
por: Bramham, P, et al.
Publicado: (1975) -
Run 605, 26.5.1975, Ring 2, 26 GeV/c, Longitudinal stability of stacked beams
por: Hofmann, A, et al.
Publicado: (1975)