Cargando…
"ISR Performance Report, Run 587 Ring 1, 15 GeV/c, TW, ""LUMS"" at 15 GeV/c with Terwilliger Scheme"
Autor principal: | Potter, K M |
---|---|
Lenguaje: | eng |
Publicado: |
1975
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130982 |
Ejemplares similares
-
"ISR Performance Report, Run 605 Ring 1 26 GeV/c TW, Precision of ""LUMS"" with Terwilliger scheme"
por: Potter, K
Publicado: (1975) -
"ISR Performance Report, Run 586, Ring 1, 236 GeV/c, TW, Measurement of ""LUMS"" bumps with Terwilliger scheme"
por: Potter, K M
Publicado: (1975) -
Run 1164 - 11th December 1980, Rings 1 and 2 - 15.376 GeV/c, Operation with the Terwilliger Scheme at 15 GeV/c
por: Bryant, P J
Publicado: (1980) -
Run 199 - 20 July 1972, Rings 1 and 2 - 15.37 GeV/c - 20 bunches: Terwilliger scheme working line at 15 GeV/c
por: Bryant, P J
Publicado: (1972) -
Run 575 - 26 GeV/c - 10.3.1975, Run 580 - 26 GeV/c - 17.3.1975, Run 587 - 15 GeV/c - 3.4.1975: Various coupling measurements in the ISR
por: Bryant, P J, et al.
Publicado: (1975)