Cargando…
Clearing, Pressure Bump, Beam Behaviour, Run 590, 7.4.75, R1 + R2, 26 GeV/c
Autores principales: | Gröbner, Oswald, Hübner, K |
---|---|
Lenguaje: | eng |
Publicado: |
1975
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130987 |
Ejemplares similares
-
Run 651, 75-11-03, 26 GeV, Clearing current measurement
por: Gröbner, Oswald, et al.
Publicado: (1975) -
run 656, 75-11-10, Ring 1, 26 GeV, ELVA, Pressure bumps at B-max places
por: Gröbner, Oswald, et al.
Publicado: (1975) -
Run 641, 26 GeV, FP-line, 13.10.75, Run 656, 26 GeV, ELSA-line, 11.11.75, Run 669, 26 GeV, 8C-line, 02.12.75, RF-clearing experiments with the scanning cavity
por: Frischholz, Hans, et al.
Publicado: (1976) -
Run 590, 26/31 GeV/c, 1/1, 20b, Ring 2, 7.4.75, Acceleration to 31.4 GeV/c - Ring 2
por: Myers, S, et al.
Publicado: (1975) -
Run 589, 26 GeV/c, ELSA, 7.4.75, Stack Centring using the R.F. and the main Field
por: Myers, S
Publicado: (1975)