Cargando…
Run 600, 19.5.1975, Ring 1, 26 GeV, Run 605, 26.5.1975, Ring 2, 26 GeV, Reanalysis of runs 564, 577, 587 and 590, Blow-up of bunch area (4)
Autores principales: | Hansen, S, Hofmann, A |
---|---|
Lenguaje: | eng |
Publicado: |
1975
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130997 |
Ejemplares similares
-
Run 605, 26.5.1975, Ring 2, 26 GeV/c, Longitudinal stability of stacked beams
por: Hofmann, A, et al.
Publicado: (1975) -
Run 605, 26.5.1975, Ring 2, 26 GeV/c, Debunching of a single pulse after injection
por: Hofmann, A, et al.
Publicado: (1975) -
Run 600, 20.5.1975, Ring 2, 26 GeV, Run 605, 27.5.1975, Ring 2, 26 GeV, Run 610, 28.6.1975, Ring 2, 26 GeV, Making stable bunches with an active Landau cavity
por: Bramham, P, et al.
Publicado: (1975) -
Run 580, 17.3.1975, Ring 2, 26 GeV, Run 595, 13.5.1975, Ring 2, 26 GeV
por: Bramham, P, et al.
Publicado: (1975) -
Run 587, 3.4.1975, Ring 2, 15 GeV, Run 590, 7.4.1975, Ring 1, 26 GeV: Blow-up of the bunch area (3)
por: Hansen, S, et al.
Publicado: (1975)