Cargando…
Run 600, 20.5.1975, Ring 2, 26 GeV, Run 605, 27.5.1975, Ring 2, 26 GeV, Run 610, 28.6.1975, Ring 2, 26 GeV, Making stable bunches with an active Landau cavity
Autores principales: | Bramham, P, Fischer, C, Hofmann, A, Peschardt, E |
---|---|
Lenguaje: | eng |
Publicado: |
1975
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1130998 |
Ejemplares similares
-
Run 580, 17.3.1975, Ring 2, 26 GeV, Run 595, 13.5.1975, Ring 2, 26 GeV
por: Bramham, P, et al.
Publicado: (1975) -
Run 600, 19.5.1975, Ring 1, 26 GeV, Run 605, 26.5.1975, Ring 2, 26 GeV, Reanalysis of runs 564, 577, 587 and 590, Blow-up of bunch area (4)
por: Hansen, S, et al.
Publicado: (1975) -
Run 605, 26.5.1975, Ring 2, 26 GeV/c, Longitudinal stability of stacked beams
por: Hofmann, A, et al.
Publicado: (1975) -
Run 580 -26 GeV/c - 18.3.1975, Run 586 - 26 GeV/c - 26.3.1975, Run 590 - 26 GeV/c - 8.4.1975: Tests with the low-B insertion in 17
por: Autin, B, et al.
Publicado: (1975) -
Run 600 - 19 May 1975 - 26 GeV/c, Run 603P - 24 May 1975 - 26 GeV/c
por: Brand, K, et al.
Publicado: (1975)