Cargando…
RF-clearing, e-p lines and electron noise, Run 605, Ring 2, 26 GeV/c, ELSA working line, beam current 9.4 A, 26.5.75
Autores principales: | Gröbner, Oswald, Strubin, P |
---|---|
Lenguaje: | eng |
Publicado: |
1975
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131004 |
Ejemplares similares
-
Run 605, 26/05/75, 26 GeV/c without SFM: Influence of the clearing electrodes on $h_{eff}$ during shaving
por: Gröbner, Oswald, et al.
Publicado: (1975) -
Tun 580, 26 GeV, ELSA - working line, 75.03.17: Measurement of the self-clearing rate as a function of beam current
por: Gröbner, Oswald, et al.
Publicado: (1975) -
Run 641, 26 GeV, FP-line, 13.10.75, Run 656, 26 GeV, ELSA-line, 11.11.75, Run 669, 26 GeV, 8C-line, 02.12.75, RF-clearing experiments with the scanning cavity
por: Frischholz, Hans, et al.
Publicado: (1976) -
Run 651, 75-11-03, 26 GeV, Clearing current measurement
por: Gröbner, Oswald, et al.
Publicado: (1975) -
Run 586, 26 GeV, modified ELSA working line, 26, 27.3.1975: Experiment on long term vacuum stability in R1 and R2
por: Gröbner, Oswald, et al.
Publicado: (1975)