Cargando…
Experiments done on 30th May 1975 during run 609, Capturing changing phenomena and measuring their spectra (with equipment that we already have)
Autor principal: | Sabersky, A |
---|---|
Lenguaje: | eng |
Publicado: |
1975
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131011 |
Ejemplares similares
-
Run 609 - 30 May 1975, Ring 1 - 26.588 GeV/c, Matching tolerances
por: Autin, B, et al.
Publicado: (1975) -
Run 609 - 30 May 1975 - 26 GeV/c, Measurement of Beam-Beam Induced Q-shifts on ELSA
por: Bryant, P J, et al.
Publicado: (1975) -
Run 612, 30th June 1975, 26 GeV, Low-frequency longitudinal bunch instability during debunching
por: Sabersky, A
Publicado: (1975) -
Run 580, 17.3.1975, Ring 2, 26 GeV, Run 595, 13.5.1975, Ring 2, 26 GeV
por: Bramham, P, et al.
Publicado: (1975) -
Run 577, 26.5891 GeV/c, 13th March 1975, Markers on the stack for Schottky scan
por: Sabersky, A
Publicado: (1975)