Cargando…
Run 609 - 30 May 1975 - 26 GeV/c, Measurement of Beam-Beam Induced Q-shifts on ELSA
Autores principales: | Bryant, P J, Lewis, D M |
---|---|
Lenguaje: | eng |
Publicado: |
1975
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131012 |
Ejemplares similares
-
Run 609 - 30 May 1975, Ring 1 - 26.588 GeV/c, Matching tolerances
por: Autin, B, et al.
Publicado: (1975) -
Measurement of Incoherent Q-Shifts due to Small Stacks, Runs 609, 612 (Ring 1) ELSA 26 GeV/c
por: Lewis, D
Publicado: (1975) -
Run 612 - 1st July 1975, Rings 1 and 2 - 26 GeV/c - SFM on Measurement of Beam-Beam Q-Shift
por: Bryant, P J
Publicado: (1975) -
Run 516 - 30 August 1974, Ring 1 - 26 GeV/c: Booster beam (reduced intensity), A new look at ELSA
por: Bryant, P J
Publicado: (1974) -
Run 609 MD, 20b, 26 GeV/c, 1/1, 30.5.75, Transverse Stability Test on ELSA - 31 amps
por: Myers, S, et al.
Publicado: (1975)