Cargando…
Run 612 - 1st July 1975, Rings 1 and 2 - 26 GeV/c - SFM on Measurement of Beam-Beam Q-Shift
Autor principal: | Bryant, P J |
---|---|
Lenguaje: | eng |
Publicado: |
1975
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131018 |
Ejemplares similares
-
Run 612 - 30 June 1975, Ring 1 - 26 GeV/c - Low-B- SFM, Orbit Measurements
por: Brand, K, et al.
Publicado: (1975) -
Run 612P, 30.6.1975, Ring 1, 26 GeV/c, Q-Modulation and Decay Rate
por: Wyss, C
Publicado: (1975) -
Run 609 - 30 May 1975 - 26 GeV/c, Measurement of Beam-Beam Induced Q-shifts on ELSA
por: Bryant, P J, et al.
Publicado: (1975) -
Run 344 - 9 August 1973, Rings 1 and 2 - 26 GeV/c - 20 bunches, SFM Running-In (No. 3 - 26FP with SFM at 1.0 T)
por: Billan, J, et al.
Publicado: (1973) -
Automatic Compensation of Space Charge Q-Shifts, Runs 612 (Ring 1), 621 (Ring 2) ELSA, 26 GeV/c
por: Bryant, P J, et al.
Publicado: (1975)