Cargando…
Run 614, 3.7.1975, Ring 2, 26 GeV, Blow-up of bunch area (5)
Autor principal: | Hofmann, A |
---|---|
Lenguaje: | eng |
Publicado: |
1975
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131027 |
Ejemplares similares
-
Run 614, 3.7.1975, Ring 2, 26 GeV, Effect of a capacitive impedance
por: Bramham, P, et al.
Publicado: (1976) -
Run 575, 10.3.1975, Ring 2, 26 GeV: Blow-up of the bunch area
por: Hofmann, A
Publicado: (1975) -
Run 587, 3.4.1975, Ring 2, 15 GeV, Run 590, 7.4.1975, Ring 1, 26 GeV: Blow-up of the bunch area (3)
por: Hansen, S, et al.
Publicado: (1975) -
Run 600, 19.5.1975, Ring 1, 26 GeV, Run 605, 26.5.1975, Ring 2, 26 GeV, Reanalysis of runs 564, 577, 587 and 590, Blow-up of bunch area (4)
por: Hansen, S, et al.
Publicado: (1975) -
Run 577, 13.3.1975, Ring 1 and 2, 26 GeV, Run 580, 17.3.1975, Ring 1, 26 GeV: High frequency structure during debunching and blow-up of the bunch area
por: Hofmann, A, et al.
Publicado: (1975)