Cargando…
Run 625 - 22 July 1975, Ring 1 - 26 GeV/c - Low-B, Measurement of B's at pick-ups
Autor principal: | Brand, K |
---|---|
Lenguaje: | eng |
Publicado: |
1975
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131037 |
Ejemplares similares
-
Run 625 - 25 July 1975, Ring 2 - 26.588 GeV/c, Experimental gradient stopbands of the steel low-B section
por: Autin, B
Publicado: (1975) -
Run 679 - 16 December 1975, Ring 1 - 11 GeV/c - ELSA, Measurement of B's at pick-ups
por: Brand, K
Publicado: (1975) -
Run 580 -26 GeV/c - 18.3.1975, Run 586 - 26 GeV/c - 26.3.1975, Run 590 - 26 GeV/c - 8.4.1975: Tests with the low-B insertion in 17
por: Autin, B, et al.
Publicado: (1975) -
Run 662 - 18 November 1975, Ring 1 - 26 GeV/c - low-B, Measurement of B
por: Brand, K, et al.
Publicado: (1975) -
Run 580, 17.3.1975, Ring 2, 26 GeV, Run 595, 13.5.1975, Ring 2, 26 GeV
por: Bramham, P, et al.
Publicado: (1975)