Cargando…
"ISR Performance Report, Run 618P 15 GeV x 15 GeV + SFM (SP15), I7 Magnet on at -60% (17.30 on 17.12.75 - 09.00 19.12.75), ""Clearing Voltage and Background R2"""
Autor principal: | Ashfield, C |
---|---|
Lenguaje: | eng |
Publicado: |
1976
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131074 |
Ejemplares similares
-
Run 679, 11 GeV/c, 15.12.75, High-beta insertion
por: Zotter, B
Publicado: (1975) -
Run 679, 11 GeV/c (both rings) + 10 GeV/c to SPS (simulated) (15.12.75)
por: Kemp, D, et al.
Publicado: (1976) -
MD Run 631 - 30.9.75, Ring 1 and 2 - 15 GeV/c - Low-B - no SFM
por: Brand, K, et al.
Publicado: (1975) -
Run 679, 15.12.75, R1, 1 bunch, 11 GeV/c, Dilution of one bunch
por: Peschardt, E
Publicado: (1976) -
High Intensity Stacking at 15 GeV/c, Run 745, 15 GeV/c, ELSA, both rings SFM on, I7 experimental magnet on
por: Lewis, D
Publicado: (1976)