Cargando…
"ISR Performance Report, Run 674, 26 GeV/c, Ring 1, ELSA, Radial dependence of ""LUMS"" bumps on ELSA"
Autor principal: | Potter, K |
---|---|
Lenguaje: | eng |
Publicado: |
1976
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131084 |
Ejemplares similares
-
Run 564 26 GeV/c, ELSA, Rings 1 and 2: Vertical Bumps on Working Line ELSA
por: Potter, K M
Publicado: (1975) -
"ISR Performance Report, Run 586, Ring 1, 236 GeV/c, TW, Measurement of ""LUMS"" bumps with Terwilliger scheme"
por: Potter, K M
Publicado: (1975) -
"ISR Performance Report, Run 605 Ring 1 26 GeV/c TW, Precision of ""LUMS"" with Terwilliger scheme"
por: Potter, K
Publicado: (1975) -
Run 656 - 10.11.75 - 26 GeV/c - no SFM, A new lok at ELSA: Telescopic ELSA
por: Koutchouk, Jean-Pierre
Publicado: (1975) -
Run 546 - 13 November 1974, Ring 1 - 26 GeV/c: Stacking on ELSA
por: Bryant, P J
Publicado: (1974)